- 详情
- 2021-09-10
- 简介
pdf
- 407KB
- 页数 未知
- 阅读 96
- 下载 33
The switches installed in converter station valve halls in Xiangjiaba-Shanghai ±800 kV UHVDC project are expensive and maintenance inconvenience.Two optimization schemes of the valve hall grounding switches for researches on the function and operation of the switchers are presented.The two schemes are both studied in detail,with one way of abolishing all grounding switches on transformer valve side,and another way of partly cancelling the switches.Detailed analysis is further carried out for the feasibility and the pros and cons of the two schemes.Based on the comparison of two schemes,the partial reduction of grounding switches is selected to get a simulation with an EMTDC model.Plus in order to verify the reliability of the simulating results,a field test is carried out in Fengxian converter station with the partly switches cancellation scheme.The test results proved that using only one switch can still release residual charge in the valve hall in a relatively short period.Optimized designs of the valve hall switches can save both space and costs of the project.
对不起,您暂无在线预览权限,如需浏览请
立即登录热门商品

xxx***
擅长:
市政 园林 给排水 暖通
- -
服务
- 3
商品
- -
人气
相关推荐
特高压直流输电工程阀厅接地开关布置优化(英文) 407KB
特高压直流输电的优势. 601KB
±800kV特高压直流输电工程换流站 196KB
湖南:酒湖特高压直流输电工程启动送电 112KB
特高压直流输电工程SCADA系统的研究和应用 1.6MB
ABB参与国家特高压直流输电工程建设 501KB
特高压直流输电工程节能设计实践 748KB
特高压直流输电工程户外汇控箱防凝露研究 1.6MB
特高压直流输电工程关键技术应用分析 187KB
世界首个特高压直流输电工程升压成功并运行 91KB