- 详情
- 2020-12-27
- 简介
pdf
- 706KB
- 页数 5P
- 阅读 61
- 下载 20
The effective and assured measures in criteria of formulation, procedures, techniques and methods for geological prospecting of Qinghai-Xizang Railway have been made. The permafrost engineering geological investigation indicate the talik and those sections with annual average ground temperature higher than 1 ℃ takes up 68.8% of total amount; the high ice content permafrost also account for 50% of real permafrost section. The distribution of permafrost characteristics is obviously influenced by altitude and latitude. The prospecting also shows the distribution of permafrost characteristics is rather complicated. Based on two predications of air temperature-rising tendency, by calculating climate model of permafrost thermal status, and comparing and analyzing geological distribution of Qinghai-Xizang Railway, the tendency of permafrost recession range has been predicated.
对不起,您暂无在线预览权限,如需浏览请
立即登录热门商品
相关推荐
青藏铁路多年冻土工程地质勘察 544KB
青藏铁路多年冻土工程地质工作综述 187KB
青藏铁路多年冻土工程地质综合分类探讨 467KB
青藏铁路多年冻土工程特性与冻土工程 530KB
青藏铁路多年冻土工程的探索与实践 1.6MB
青藏铁路设计与建设——第六届国际冻土工程会议回顾(英文) 1.4MB
对青藏铁路多年冻土工程特征的几点认识 117KB
青藏铁路多年冻土工程的几个关键施工技术问题 318KB
青藏铁路多年冻土工程的几个关键施工技术问题 930KB
青藏铁路多年冻土地段的地质环境和工程地质问题 497KB